Building your house: 10 precautions before you commit

Land, buildability, subsoil, risks, builder, financing, insurance: the 10 points to check before building your home.

The essentials

  • First check the location, buildability and viability of the land before making any commitment.
  • Have the subsoil and natural risks examined, as these can increase construction costs.
  • Plan the overall financing, land and construction, as well as running costs during the works.
  • Check the builder, the contract and the insurance that protects your project.

Choosing the right plot

According to MoneyVox, the choice of land shapes your daily life and that of your family. You should consider access to transport, schools and healthcare, as well as nearby noise or odour nuisances, such as a expressway, a railway line or a waste treatment plant.

Certain plants, such as reeds, willows or poplars, can indicate wet ground and a nearby water table, which may increase foundation costs. Also think about future resale: a well-located, well-connected house sells more easily.

The seller of a buildable plot must provide information on exposure to airport noise. According to the estate agents and notaries cited by the source, the nuisance from a flight path leads to a significant price reduction within a radius of roughly 20 km around an airport.

Buildability and utilities

The plot must be shown as buildable in the local urban plan (PLU). A plot within a planned development (lotissement) is in principle buildable and serviced, whereas an isolated plot, known as diffus, requires more thorough checks. For the latter, an operational planning certificate is useful, but a favourable opinion does not amount to the town hall's approval.

In the preliminary agreement or contract, it is strongly recommended to add a condition precedent that the building permit be obtained, in addition to the mortgage condition. Without it, the buyer may remain bound if the permit is refused.

Utilities refers to water, electricity, telephone, drainage and access roads. If the connection points are far away, connection fees can be high: obtain a quote from each provider before buying.

Subsoil, easements and risks

The quality of the ground is decisive. Clay soils carry a risk of cracking; in that case the builder may need to plan deep foundations or a crawl space. A plot that is too steep or too narrow may also lead to extra costs or require the plans to be revised.

In some areas exposed to ground shrinkage and swelling, the seller must provide a prior geotechnical survey, which the builder takes into account. Easements, such as rights of view or rights of way, must be examined in the planning certificate, and a plot burdened with constraints warrants a price negotiation.

Flood, ground movement, radon and seismic risks can be checked notably on the georisques.gouv.fr website, as well as with the town hall and the prefecture.

Builder, contract and financing

The builder must have a fixed address, a good reputation and proven expertise. Compare several quotes and ask for examples of completed work. A price clearly below the local market, by 5 to 10%, should prompt caution.

A contract for building an individual house may be signed with or without the supply of plans. A 10-day cancellation period applies, and use of an architect is mandatory above 150 m² of floor area.

The financing must cover the purchase of the plot and the construction. Do not forget the zero-rate loan (prêt à taux zéro), subject to conditions, nor the development tax payable during the works. During construction you may be paying both rent and loan repayments; a payment deferral may then be negotiated with the bank. Future running costs, such as home insurance, property tax or transport costs, must also be factored in.

Guarantees and insurance

Before signing, check the builder's guarantees. The guarantee of delivery at the agreed price and deadline allows the work to be completed in case of default. The builder is liable for 10 years for defects that compromise the soundness of the house and must take out decennial liability insurance.

On your side, the building damage insurance (assurance dommage-ouvrage) allows you to obtain payment for repair work in the event of damage, without waiting for liability to be established. For the legal and tax aspects of your case, consult a notary or lawyer.

What this means for Cannes and the Côte d'Azur

What this means in Cannes and on the Côte d'Azur: for an owner, seller or buyer in the region, these precautions are especially important when the plot is in a scattered rural area (diffus), on a slope or near a busy road. Check the commune's local urban plan (PLU), consult natural risks on georisques.gouv.fr and request a planning certificate (certificat d'urbanisme) before any preliminary agreement. A notary or local professional can help you assess the impact of an easement or nuisance on the property's value.

Article written by agwelcome with the help of artificial intelligence, based on the MoneyVox article cited at the top of the page. It does not replace the advice of a notary, a lawyer or another professional.

A question about your property?

Sales, rentals, estates, valuations: write to me on WhatsApp, I will reply promptly.

Write on WhatsApp
How do you prefer to contact me? Phone call+33 6 26 94 65 13 Send a text message+33 6 26 94 65 13 I reply straight away, within a few minutes.